L1B EXTENSION
SAP CALCULATIONS
CONDUCTED BY EXPERIENCED ASSESSORS
Book in your SAP calculation now. We aim to complete your SAP in a 48-hour time period.
Our SAP calculation extension service provides fast, accurate assessments carried out by experienced assessors to help ensure compliance with building regulations and support a smooth approval process.
Extension
Standard Assessment Procedure
Calculations Explained
The carbon output is increased where there are areas of extensive glazing. This is due to heat the increase in heat loss. To counteract this increase in carbon output and reduce any unnecessary heat loss, certain building alterations can be implemented.
Installing solar panels to the exterior of the building could be used as an example of a method of balancing out the increased carbon loss. This modification to the design of the proposed extension would provide enough remedial work to pass the SAP calculation.
With multiple years of combined experience dealing in SAP extensions, our assessors will be able to provide you with the most cost-effective and time-saving approach to passing your SAP calculation.
What our
Standard Assessment Procedure
Assessors need from you
For our assessors to prepare and complete your buildings SAP calculations we will need to gather the following drawings and specifications from you;
Drawings for proposed & existing dwelling:
- Elevation, section drawings
- Floor plans
- Site plans
Specifications
- Windows: incl. frame material, width of gap & emissivity of glass
- Doors: incl frame material & width of gap
- Heating & Cooling
- Ventilation system
- Hot water system: cylinder size & controls
If there is anything you feel unclear about or you simply want to speak to one of our team members, don't hesitate to give our office a call.
